TM 9-4110-255-14
b. Installation.
(1) Install control box assembly (20) and secure with six screws (19).
(2) Push wires leads through strain relief cable bushing (1 ).
8
(3) Install strain relief cable bushing (18) through control box (20) and secure with lock nut (17).
(4) Using tags and wiring diagram (fig 1-4), connect all wire leads to appropriate components. Remove tags.
(5) Carefully push sensing bulb (15) through grommets (14), and access sleeve (16). Install tie down straps as
necessary.
(6) Install grommets (14) and tie down straps (13) as necessary.
(7) Slip clamp (11) over sensing bulb (15).
(8) Install clamps (11) and (12), bolt (10), new lock washer(9) and new self locking nut (8).
(9) Install sensing bulb bracket (7), two flat washers (6), new lock washers (5), and bolts (4).
(10) Close control panel (3) and install two new lock washers (2) and bolts (1).
(11) Apply silicone RTV into grommets (14) to seal evaporator enclosure.
NOTE
FOLLOW-ON MAINTENANCE:
Unlatch and close control box cover door.
Connect battery (para 4-35) and put unit back into service.
4-55