TM 9-4110-255-14
5-46. ENGINE OIL PUMP INSPECTION AND REPLACEMENT .-Continued
c. Installation.
(1) Install rotor (4) with the bevel facing out.
(2) Install rotor (5) with bevel facing out.
(3) Install new o-ring (3) into cover (2).
(4) Install cover (2) and three screws (1). Torque screws to between 65 ft lb and 80 ft lb (88 Nm and 109 Nm).
NOTE
FOLLOW-ON MAINTENANCE:
Close left side door.
Connect battery (para 4-35) and put unit back into service.
5-47. FLYWHEEL REPLACEMENT .
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools:
Equipment Conditions:
Flywheel puller
Left side door open.
9, Appendix B
Front door open.
Refrigeration unit shut down (para 2-7) and battery
a. Removal.
(1) Remove screw (1), flat washer (2), and cylinder casing (3).
(2) Remove two screws (4) and cover (5).
(3) Remove two screws (6).
(4) Remove screw (7) and flat washer (8).
(5) Remove two screws (9) and flat washers (10).
(6) Remove screw (11)
(7) Remove shroud (12) and cover (13).
(8) Remove nut (14), washer (15), pulley (16), and screen (17). Pin (18) can be removed if necessary.
(9) Install flywheel puller onto flywheel (19).
5-96