3-3. GENERAL.
With the exception of service and inspection procedures noted in the PMCS table 2-1, the following maintenance
procedure is the only one authorized to the operator.
3-4. CLEANING.
This task covers:
Cleaning
INITIAL SETUP
General Safety Instructions:
Equipment Conditions:
Reference
WARNING
Doors open as necessary.
High voltage and exposed rotating
parts
are
contained
in
the
Materials/ Parts:
refrigeration unit. Personal injury
can result if power is connected.
Detergent
Rag
Cleaning.
(1) Mix a small quantity of detergent with clean water to make a wash solution.
(2) Dampen a rag with wash solution and clean the equipment.
(3) Dampen a rag with clean water and rinse the equipment. Rinse rag in clean water and continue until all
detergent residue has been removed.
(4) Wipe the equipment with a clean dry rag until thoroughly dry.