TM 9-4110-258-13
5.35 PRESSURE GAGE (HIGH) REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts:
Equipment Conditions:
Lock Washers (3)
Left side door open.
Anti-Seize Tape
a. Removal.
(1) Remove three bolts (1), lock washers (2), and pressure gage (3) as far as copper tubing (4) will allow.
Discard lock washers.
(2) Loosen flare nut (5) and move copper tubing (4) over to one side being careful not to bend or kink tubing.
(3) Remove coupling (6).
Figure 5-30. Pressure Gage (High)
5-66