TM 9-4110-258-13
5.36
HEAT EXCHANGER REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/ Parts:
Equipment Conditions:
Insulation Tape
a. Removal.
(1) Remove insulation (1) as necessary.
(2) De-braze five fittings (2) from heat exchanger (3) (para 5.10).
(3) Loosen or remove two hose clamps (4) and remove heat exchanger (3).
Figure 5-31. Heat Exchanger
5-68