4-46. JUNCTION BOX REMOVAL/INSTALLATION - Continued.
(6) Insert push-pull control wire end through hole in connector plate.
(7) Slip core end fitting on push-pull control wire end and tighten screw.
(8) Flip circuit breaker to OFF (down) position.
(9) With core end fitting positioned as shown on Figure 4-50, secure push-pull control wire casing to side of
junction box with two screws, spacers, and clamps.
(10) Be sure that circuit breaker is turned on when knob on rear of air conditioner is pulled out and pushed in.
Pushing knob in should not turn circuit breaker off.
(11) Carefully move junction box into position and align mounting hardware.
(12) Tighten four captive panel fastener screws.
(13) Insert bottom flange of lower front panel inside the lip of the cabinet base.
(14) Push top of lower front panel into position.
(15) Secure lower front panel with two captive panel fastener screws.
(16) Connect power cable.
(17) Turn on power at power source.