TM 9-4120-388-14
4-49. JUNCTION BOX HARNESSES.
This task consists of:
a. Inspection/Test
b. Repair
INITIAL SET-UP:
Equipment Condition
a. Inspection/Test.
(1) Check connectors for general condition and loose, broken, or missing contacts. Replace damaged connectors.
(2) Check individual wires for Ioose solder connections, loose terminal lug connections, cut or frayed insulation,
and cut or broken wires.
(3) See wiring diagram (Figure 4-16) and continuity test individual wires. Repair or replace wires with no continuity.
b. Repair.
(2) See Table 4-3 (Wire List) for wire lengths and terminal/connector information.
(3) After repairs are complete, place junction box cover on box and align hardware.
(4) Secure junction box cover with four captive panel fastener screws.