TM 9-4120-398-14
UNIT MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS, SPECIAL TOOLS, TEST, MEASUREMENT AND DIAGNOSTIC EQUIPMENT
(TMDE), AND SUPPORT EQUIPMENT
a. Common Tools and Equipment. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE) applicable to your unit.
b. Special Tools, TMDE, and Support Equipment. Test, Measurement, and Diagnostic Equipment (TMDE) and support
equipment include standard equipment found in any organizational maintenance shop. No special tools are required for
maintenance of this equipment.
c. Repair parts. Repair parts and special tools are listed and illustrated in the TM 9-4120-398-24P Repair Parts and
Special Tools List (RPSTL), covering Unit, Direct Support, and General Support Maintenance for this equipment.
Section II. SERVICE UPON RECEIPT OF EQUIPMENT
4-2. UNLOADING. The air conditioner is
shipped assembled and ready for subsequent operation. The system
contains a
full charge of refrigerant compressor oil. To unload and set for use, proceed as follows:
Do not lift air conditioner by tiedown eyes. Injury to personnel or damage to equipment could occur from
improper hoisting.
a. Remove tiedowns. Unload unit using a hand truck or fork lift.
b. Move air conditioned to installation site and position as described in paragraph 4-5.
c. Inspect air conditioner as directed in Section III.
a. General. Normally, the packaged air conditioner should be moved into the immediate area in which it is to reinstalled
before it is unpacked.
b. Remove shipping container. Cut metal bands that hold the top of container to pallet. Remove staples that secure fiber
board container to pallet. Lift container vertically and remove it from the base and cabinet.