TM 9-4120-399-14
(9) Leak test all newly connected joints and those in the repair area (See para. 5-10).
(10)
(11)
(12)
This Task Covers:
b. Installation
a. Removal
I
Initial Setup:
Tools Required
Tool kit, Refrigeration
Material's Required
Equipment Condition
Air conditioner shut down and cool.
a. Removal.
Hold fitting (2) so that it cannot be twisted and unscrew fusible plug (1).
b. Installation.
(1) Apply anti-seize tape (Appendix E, Item 10) to threads of fusible plug (1).
(2) Screw fusible plug (1) in place while holding adapter fitting (2).
(4) Leak test all newly connected joints and those in the repair area (See para. 5-10).