TM 9-4120-402-14
Section III MAINTENANCE PROCEDURES
5-3. GENERAL.
The procedures in this section have been arranged in the order in which the items appear in the direct support (F)
maintenance level column on the Maintenance Allocation Chart (MAC) which is provided in Appendix B. Step-by-step
procedures have been provided for all action authorized to be performed by direct support maintenance in the order in
which they appear on the MAC. Actions authorized to be performed by unit and general support maintenance have been
duly noted; step-by-step procedures for these actions may be found in Chapters 4 and 6 respectively.
5-4. FABRIC COVER.
This task covers: a. Repair
b. Replace
INITIAL SETUP
Tools
Materials/Parts
Refrigeration Unit Service Tool Kit
Fabric Cover
Equipment Condition
NOTE
For removal, inspection, lubrication, cleaning and installation, see paragraph 4-10.
a.
Repair.
Minor rips, cuts, tears, or punctures may be repaired by applying a patch to the inside surface.
b.
Replace.
For damage of greater extent, or missing eyelets or snap fasteners, replace the entire cover.
5-9