TM 9-4120-403-14
Figure 5-27. Receiver (R)
Inspection
(1) Check for general condition and signs of leakage. If leakage is suspected, leak test per paragraph 5-10.
(2) Check that mounting hardware is secure.
Replacement
(1) Remove two screws and two lockwashers in two clamps.
(2) Remove two screws, lockwashers, nuts, and clamps from the receiver.
(3) While purging the system with nitrogen, debraze the tube joints. (See paras 5-8 and 5-9.)
(4) Remove the receiver.
(5) Loosely secure clamp with two screws, lockwashers and nuts to the receiver.
5-88