TM 9-4120-403-14
(6) Place the receiver on the tube ends.
(7) While purging the system with nitrogen, braze the tube joints. (Seeparas 5-8 and 5-9.)
(8) Secure the two receiver clamps to the casing side panel with two screws and lockwashers.
(9) Tighten two clamps on receiver.
Follow-on procedures:
(3) Leak test all newly connected joints and those in the repaired area. (See para 5-10.)
(4) Evacuate the refrigeration system. (See para 5-11.)
(5) Charge the refrigeration system, but do not operate unit. (See para 5-12.)
5-89