5-26. THERMOEXPANSION VALVE (TEV) MAINTENANCE. (Continued)
NOTE
Seal all joints and seams of insulation with adhesive. Wrap ends of insulation twice around tightly
using tape to secure. Use tape where capillary tube exits insulation to seal opening in insulation.
(4) Install new insulation around suction line tube assembly (1) and TEV sensing bulb (5) from evaporator coil to
outlet connection.
(5) Follow on maintenance:
(a)
(b)
(c)
(d)
This task covers:
Remove
Install
Repair
INITIAL SETUP:
Tools
Materials/Parts (Continued)
Tool Kit, Service Refrigeration Unit, Appendix
B, Section III, Item 1
Recovery and Recycling Unit, Refrigerant,
Regulator, Nitrogen, Appendix B, Section III,
Preformed Packing, Appendix G, Item 3 (In
Item 9
Line) (Quantity 2)
III, Item 12
(Out Line) (Quantity 2)
Refer to TM 9-4120-408-24P for part numbers of
III, Item 13
items to be replaced.
Manifold Gage, Charging and Testing, Appendix
Equipment Conditions
B, Section III, Item 16
Item 17
Evaporator Side Panel removed,
Materials/Parts
Evaporator Fan Assembly removed, paragraph
5-18.
General Safety Instructions
Do not work on equipment without
following standard shop safety precautions.
Change 1 5-64