TM 9-4910-387-14-1
(6) Detonate the charges.
The danger zone is approximately 250 yards (229 meters).
(5) In the absence of a welding or cutting torch, place piles of combustible on and about the
Elapsed time: about 4 minutes.
tester. Pour gasoline or oil over the combustible and the materiel; ignite by means of an incendiary
grenade fired from a safe distance, by a combustible train of suitable length, or other appropriate
means. Take cover immediately. A hot fire is required to render the materiel useless. Elapsed
1-4.
OFFICIAL NOMENCLATURE, NAMES, AND DESIGNATIONS
time: about 15 minutes.
This listing includes the nomenclature cross-reference list and the list of abbreviations used in this
f. If destruction by demolition is directed, due consideration should be given to the observance
manual.
of appropriate safety precautions. For complete details on the use of demolition materials, refer to
FM 5-25.
a. Nomenclature Cross-Reference List.
g. For destruction by demolition:
Common Name
Official Nomenclature
(1) Disconnect the tester from its source of
electricity.
Absorbent material ......................................................................................... Oil and water absorbent
material
Amber lens ........................................................................................................................... Light lens
(2) Remove all metal panels.
Auxiliary motor ................................................................................................. 1/2 Horsepower motor
Auxiliary motor switch................................................................. Motor starter switch with heater P-28
(3) Planning for simultaneous detonation, prepare and place four 1-lb (0.45-kg) demolition
Bearing ............................................................................................................................ Ball bearing
charges (using a 1-lb (0.45-kg) TNT block or equivalent per charge, together with the necessary
BULB TEMPERATURE gauge .......................................................................................Thermometer
detonating cord to make up each charge) as follows:
Burette ................................................................................................. Graduate and valve assembly
Cap ......................................................................................................................... Filler opening cap
(a)
Place the first charge in the RH control equipment assembly.
Clamp ...............................................................................................................................Tank clamp
Cleaning compound..................................................................................Solvent cleaning compound
(b) Place the second charge in the LH control equipment assembly.
Clear lamp.......................................................................................................................... Glow lamp
Clear lens ............................................................................................................................. Light lens
(c)
Place the third charge in the upper frame assembly.
Clevis ........................................................................................................................... Rod end clevis
Clinch sleeve................................................................................................ Tube fitting clinch sleeve
(d) Place the fourth charge in the lower frame assembly against the open end of the
Conduit hub ....................................................................................................Electrical box connector
main drive motor.
Coupling ............................................................................................................... Rigid shaft coupling
Cover ..........................................................................................................................Fluid filter head
(4) Connect the four charges for simultaneous detonation with detonating cord.
Cover. ............................................................................................................................... Plate cover
Cover .......................................................................................................................Waste tank cover
(5) Provide for dual priming to minimize the possibility of a misfire.
Cover assembly .......................................................................................... Fuel tank cover assembly
Cover assembly ......................................................................................... Lube tank cover assembly
Driven coupling ..........................................................................................Rigid driven shaft coupling
Dumping lever ............................................................................................................................... Bar
Element...............................................................................................................Chemistone element
FAST switch ..................................................................................................................... Push switch
Fitting ..........................................................................................................................Hydraulic fitting
1-3