TM 5-2420-230-10
Preparation for Shipment and Operation
E-1. SCOPE.
This appendix provides instructions to prepare the Interim High-Mobility Engineer Excavator (IHMEE) for shipment by all
modes of air, sea, rail, or highway along with information on readying the vehicle for operation after transportation.
E-2. PREPARATION FOR C-130 SHIPMENT AND OPERATION.
This Task Covers:
a. Preparation for Shipment
b. Preparation for Operation
INITIAL SETUP
References
Test Equipment
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
None
Drawings Required
None
Materials/Parts
Estimated Time to Complete
Dunnage, suitable
30 min.
Personnel Required
MOS 21J, Construction Engineering Operator
a. Preparation for Shipment.
(1)
Ensure vehicle is positioned on level ground.
(2)
(3)
(4)
(5)
(6)
Ensure FEL travel stops are deployed and locking clevis is attached to 4-in-1 bucket (Para 6-2).
(7)
(8)
Ensure fuel tank is 3/4 full for C-130 transport or 1/4 full for all other transport.
Change 1