TM 55-1925-284-14&P
0022 00
7. Check for leaks and proper operation. Continue to monitor the system occasionally while the system pres-
surizes. If leakage is detected, secure the system and stop the leakage.
8. Return the MSD to the desired readiness condition.
END OF WORK PACKAGE
0022 022304 -3lank
0 0- / 0 b