TM 55-1925-284-14&P
0021 00
11. Perform the Angular and Parallel Sheave Alignment procedures (WP 0016 00)
12. Remove the lockouts and tagouts (FM 55-502).
14. Check the blower for unusual noise or vibration.
15. Return the MSD to the desired readiness condition.
END OF WORK PACKAGE
0021 00-4