TM 55-1925-286-13&P
0019 00
1
2
FOLLOW-ON SERVICE
1. Remove the lockouts and tagouts (FM 55-502).
2. Return the compressor to normal operating condition (WP 0005 00).
3. Operate the compressor and check for proper operation.
4. Return the equipment to the desired readiness condition.
END OF WORK PACKAGE
0019 00--8
0019 008