TM 9-2330-211-14&P
4-37. LANDING GEAR SHOES
This Task Covers:
a.
Removal
c.
inspection and Replacement
b.
Cleaning
d.
Installation
Initial Setup:
Materials/Parts:
Tools/Test Equipment:
Brush, wire, cleaning
Hammer, hand
Jack, hydraulic hand, 10 ton
Personnel Required: Two
Punch, drive-pin, 3/8 In.
Trestle, automotive maintenance, 10 ton
Wrench, open-end, 15/16 in. (two required)
ACTION
LOCATION
ITEM
REMARKS
NOTE
This procedure covers replacement of one landing gear shoe. The procedure for
the other shoe Is the same.
REMOVAL
1.
Semitrailer (1)
Comer (13)
a.
Using Jack, raise semitrailer until shoe (4) and
pad assembly (5) are off ground.
b.
Use Jackstand for support.
2.
Lower leg (10)
Screw (12), two
Using two wrenches, with the aid of an assistant,
and shoe (4)
washers (2), and
unscrew and remove.
self-locking nut (3)
3.
Lower leg (10)
Shoe (4) and pad
With the aid of an assistant, remove.
assembly (5)
TA506917
4-110