5-16. DECK AND LOADING RAMP
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
Personnel Required: Two
Hammer, hand, carpenter's
Pliers, slip-joint, straight-nose
Wrench, open-end, 3/4 in.
ACTION
LOCATION
ITEM
REMARKS
NOTE
This procedure covers replacement of one deck board on deck and loading ramp.
The procedure is similar for all deck boards.
REMOVAL
1.
Deck board (1)
Bolt (2), bridge
a.
Using pliers, bend tab (7) up.
and frame
clip (4),
b.
Using 3/4 in. wrench, unscrew nut (6) and
crossmember (3)
lockwasher (5),
remove.
and nut (6)
c.
Take off lockwasher (5) and bridge clip (4).
d.
Using hammer, tap up on bolt (2) and take out.
e.
Perform steps a through d as ma ny times as
necessary to remove all hardware to free deck
board (1) from frame.
2.
Frame crossmember (3)
Deck board (1)
Lift off.
5-20 Change 2