TM 9-2330-213-14&P
4-60. PIPING AND VALVES REPLACEMENT.
This Task Covers:
c.
Installation
a.
Removal
b . Cleaning and Inspection
Initial Setup:
Materiais/Parts:
Equipment Conditions:
q Discharge valve in OFF position.
One hose
q
q Ten Iockwashers
Toois/Test Equipment:
General mechanic's tool kit
q
REMOVAL
a.
NOTE
if removing faucets (6) oniy, perform step 1.
Remove six faucets (6) from two faucet boxes (5 and 7).
1.
Remove four nuts (1), Iockwashers (2), screws (3), and plate (4) from two faucet boxes (5 and 7).
2.
Discard iockwashers.