TM 9-2330-271-14&P
(3) Position heater assembly (8) and secure
with screws (9).
WARNING
Turn the HEATER
circuit breaker OFF before
(1) Remove screws (9) and pull cover (2) back part
proceeding with the following.
way.
(1) Remove screws (9) securing heater
(2) Remove thermostat wires from terminal
assembly (8) in position and lower heater assembly.
board (5).
(2) Remove and mark wires leading to heater
(3) Remove attaching hardware and remove
element.
thermostatic switch (10).
(3) Remove nuts (15), washers (16) and
g. Installation of Thermostatic Switch (fig 85)
screws (17) and remove heating element (13 or 14) from
(1) Position thermostatic switch (10) and secure with
heater assembly (8).
its attaching hardware.
(2) Connect wires to proper terminals of
(1) Position heating element (13 or 14) and
terminal board (5).
secure with screws (17), washers (16) and nuts (15).
(3) Position cover (2) and secure with screws
(2) Attach wires to proper terminals.
(9).
Section II. DIRECT SUPPORT AND GENERAL
SUPPORT MAINTENANCE
9-10.
General
The specialized repair facility
performing
this
Direct support and general support maintenance
maintenance should be notified.
instructions are beyond the scope of this manual.
9-5