TM 9-2330-285-14&P/TO 36A11-21-10.1
HYDRAULIC BRAKE LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
TUBE INSTALLATION - FRONT DOLLY
NOTE
This is a typical procedure for the left or the right side
brake.
If the left side tube is being installed, omit step 15b.
15 Axle beam (1)
Brake tube (2),
a. Position tube (2) on axle beam (1).
two clamps (3),
b. Secure with clamps (3), screws (4) and
two screws (4) and
washers (5) using a cross-tip screwdriver.
two washers (5)
16 Master cylinder (6)
Brake tube (2)
Connect using a 7/16-inch wrench.