TM 9-2330-287-14&P
LANDING LEG - CONTINUED
INITIAL SETUP
Materials/Parts
Tools
Handle, reversible, 1/2-inch square
drive
Socket, 1 1/16- by1/2-inch square
drive
Stand, jack
Wrench, box-end, 1 1/8-inch
ACTION
ITEM
LOCATION
REMARKS
REMOVAL
NOTE
Typical for all models (M796 shown).
Landing leg (2)
Extend fully.
1. Reach tube (1)
Jack stand (3)
a. Position jack stand (3) under reach
2.
tube (1) near forward bolster (4).
b. Retract landing leg (2), allowing weight
of trailer to rest on jack stand (3).
Down Iockpin (5)
Remove.
3. Landing leg (2)
Capscrew (6) and
4.
Using socket, handle, and wrench,
nut (7)
remove.
Support landing leg (2).
Landing leg (2)
Remove.
5. Reach tube (1)
INSTALLATION
Landing leg (2)
Position landing leg (2) and aline mounting
6. Reach tube (1)
hole.
Capscrew (6), nut
a. Apply a light coat of grease to
7. Landing leg (2)
(7), and down
capscrew (6).
Iockpin (5)
b. Using socket, handle, and wrench, in-
stall capscrew (6) and nut (7).
Landing leg (2) must swing freely.
c. Install down Iockpin (5).
Landing leg (2)
Extend fully and remove jack stand (3).
8. Reach tube (1)