TM 9-2330-287-14&P
SPRINGS - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
REMOVAL- CONTINUED
Four bolts (2)
Using 1 1/8-inch socket, handle with 1/2-
2. Trunnion axle (1)
inch square drive, and wrench, remove.
and eight nuts (3)
Plate (5)
Remove.
3. Spring (4)
Four U-bolts (7) and
Using 15/16-inch socket and handle with
4. Two wheel axles (6)
3/8-inch square drive, remove.
sixteen nuts (8)
Four nuts (10)
Using 3/4-inch socket and handle with 3/8-
5. Two covers (9)
inch square drive, remove.
and four
iockwashers(11)
Two covers (9),
Remove.
6. Two shackle
eight spacers (13),
boxes (12)
and spring (4)
iNSTALLATION
NOTE
Trailer model M796A1 will have two extra spacers in the shackle boxes that must be
properly positioned during spring installation.
Spring (4), eight
a. Position spring (4) and spacers (13) in
7. Two shackle
spacers (13), and
shackle boxes (12).
boxes (12)
two covers (9)
b. Position and aline covers (9) on shackle
boxes (12).
Using 3/4-inch socket and handle with 3/8-
8. Two covers (9)
(11) and four
inch square drive, install.
nuts (10)
Four U-bolts (7) and
Using 15/16-inch socket and handle with
9. Two wheel axles (6)
sixteen nuts (8)
3/8-inch square drive, install.
Trunnion axle (1)
Position on spring (4).
10. Spring (4)
and plate (5)
Four bolts (2)
Using 1 1/8-inch socket, handle with 3/8-
11. Trunnion axle (1)
and eight nuts (3)
inch square drive, and wrench, install.
Jack stand (14)
Using hydraulic jack (15), remove.
12.