TM 9-2330-297-14&P
PREPARATION FOR USE - CONTINUED
1. Lift plunger handle (1).
2. Rotate stem handle (2) counterclockwise one-quarter turn.
3. Engage plunger (3) into hole in stem handle.
4. Using a suitable hoist, place 40-foot container (4) on coupled semitrailer chassis (5).
5. Set container so corner fittings (6) can be held by twist locks (7).
CAUTION
Failure to maintain 1/4-inch (6.35-mm) clearance between twist lock head and container corner
fitting when locked will result in damage to twist locks because of road shock and stress during
vehicle operation.
TA223087
2-29