TM 9-2330-297-14&P
PREPARATION FOR USE - CONTINUED
INSTALLING 40-FOOT CONTAINER ON TWO COUPLED CHASSIS - CONTINUED
6. Lift plunger handle (8).
7. Rotate stem handle (9) clockwise one-quarter turn.
8. Engage plunger (10) into hole in stem handle.
9. Maintain 1/4-inch (6.35-mm) clearance (11) by turning stem nut (12) counterclockwise to increase clearance, and
clockwise to decrease clearance.
RELOCATING BOGIES FOR TOWING UNLOADED COUPLED SEMITRAILER CHASSIS
NOTE
Bogies should be located as far forward as possible on the rear semitrailer chassis when
coupled semitrailer chassis are used without containers installed.
Use an assistant as a guide to position bogies and aline lockpins with holes in main rail.
TA223088
2-30