TM 9-2330-297-14&P
PREPARATION FOR USE - CONTINUED
INSTALLATION OF 20-FOOT CONTAINER ON SEMITRAILER CHASSIS - CONTINUED
5. Lift plunger handles (8).
6. Rotate stem handles (9) clockwise one-quarter turn.
7. Engage plungers (10) into holes in stem handles.
8. Maintain 114-inch (6.35-mm) clearance (11) by turning stem nut (12) counterclockwise to increase clearance,
and clockwise to decrease clearance.
INSTALLATION OF TWO COUPLED CONTAINERS ON TWO COUPLED CHASSIS
CAUTION
Twist locks must be in unlocked position when installing coupled containers on coupled chassis
or they may be damaged.
NOTE
Do steps 1 thru 3 when twist locks are found in locked position.
Containers are secured to semitrailer with eight twist locks.
TA223084
2-26