TM9-2330-358-14&P
4-17.
12 VOLT RECEPTACLE (NOSE BOX COVER)
This task covers:
Removal
Installation
INITIAL SETUP
Tools
Materials/Parts
Tags (item 15,
General mechanics tool kit and common supplement II
a.
Removal.
WARNING
Disconnect all outside power before performing any
maintenance on the electrical system. Failure to do so
could result in injury.
NOTE
Item 2 is on the M871 semitrailer only.
(1) Remove ten screws (1, fig. 4-1) and ten washers (2).
(2) Ease the nose box cover (3) away from the nose box (4).
(3) Tag wires to 12 volt receptacle (5).
NOTE
On the M871A1 semitrailer, unscrew, but do not remove
six screws.
(4) Unscrew, but do not remove seven screws on 12 volt receptacle (5).
(5) Withdraw wires from receptacle (5).
(6) Remove two nuts (6), lockwashers (7) and bolts (8) from receptacle (5).
Remove receptacle (5).
b.
Installation.
(1) Install 12 volt receptacle (5, fig. 4-1) in nose box cover (3). Secure
receptacle (5) with two bolts (8), lockwashers (7) and nuts (6).
4-20