TM 9-2330-373-14 & P
14-12. INTERVEHICULAR CABLE RECEPTACLE (cont)
INSTALLATION OF 24-VOLT RECEPTACLE (cont) I
4.
Make certain power source is disconnected and make a continuity check of all circuits throughout semitrailer,
5.
Wrap exposed wires and nut with tape, leaving ground wire (with lug) exposed for later installation (step 7 below).
6.
Insert ground wire and receptacle into hole in front of chassis.
Place cover assembly over receptacle flange,
with center line of cover hinge 90 from center line of-semitrailer body.
NOTE
Receptacle key must be next to cover
hinge.
7.
Aline holes in cover (1) and receptacle (5) with
holes in chassis and secure with four screws (2),
washers (3) and nuts (4), with ground lug
secured to chassis by one of the washers and
nuts.
8.
Connect power source.
1.
Cover
2.
Screw
3.
Washer
4.
Nut
5.
Receptacle
TA 314762
4-41