TM 9-2330-381-14
16.
Open clamp loop (43) and remove lanyard. Unscrew and remove drain cock (44) and lanyard from platform (air
tank) weldment. Install plug into opening.
17.
Remove three pipe-to-tube elbows (45 and 46) and straight pipe-to-tube adapter (47) from platform (air tank)
weldment. Install caps/plugs into openings.
18.
Remove two straight pipe-to-tube adapters (48) and two pipe-to-tube elbows (49 and 50) from air pressure relay
valve (51). Remove tube tee (52). Install caps/plugs into openings.
19.
Remove two locknuts (53) and screws (54) and remove air pressure relay valve (51). Discard two locknuts.
20.
Remove straight pipe-to-tube adapters (55 and 56) and two straight pipe-to-hose adapters (57 and 58) from tube
nipples (59 and 60). Remove two tube locknuts (61 and 62) and two tube nipples (59 and 60) from platform
weldment. Install caps/plugs into openings.
4-221