TM 9-2330-381-14
4-69. STOWAGE COMPARTMENT (CONT)
2.
Install four screws (2), lockwashers (6), and nuts (1) to secure stowage compartment (3) to platform (4). Lower floor
jack (5) and remove from under platform (6).
FOLLOW-ON MAINTENANCE
4-70. DAVIT ASSEMBLY
This task covers:
a. Removal
c. Inspection
e. Installation
b. Disassembly
d. Assembly
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
Degreaser tank, 20 gl, item 17, appx. B
Gloves, chemical and oil protective, item 17, appx. B
Goggles, industrial, item 17, appx. B
Materials/Parts
Cleaning compound, solvent, item 25, appx. E
Lockwasher
Lockwasher (3)
Locknut
Equipment Condition
General Safety Instructions
WARNING
When on top of gooseneck and removing or installing davit assembly, always hold
onto guardrails with one hand to avoid falling or injury to personnel may result.
4-328