TM 9-2330-381-14
INSTALLATION
1.
Lubricate five preformed packings (28) with petroleum jelly.
Install five preformed packings (28) onto five
bulkhead fittings (27).
NOTE
Be sure to check the direction in which the ball valve is to be placed on the
platform to make sure the bulkhead will be installed on the proper side of the ball
valve.
2.
Install five bulkhead fittings (27), preformed packing side first, into five ball valves (26, 21, and 16).
4-413