TM 9-2330-381-14
4-95.
GOOSENECK CYLINDER AIR RESERVOIR (CONT)
3.
Apply pipe sealant to all male threads.
Remove caps/plugs and install straight pipe-to-tube adapter (2) to
reservoir (3).
4.
Install reservoir (3) onto platform and secure with four lockwashers (8) and nuts (7).
5.
Remove caps/plugs and install hydraulic hose (1) onto straight pipe-to-tube adapter (2) on reservoir (3) .
FOLLOW-ON MAINTENANCE
Adjust gooseneck and check for leakage at reservoir (para. 2-18).
4-96.
APU
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
Materials/Parts
Locknut
Locknut (4)
Personnel Required: 2
Equipment Condition
Two bolts and hydraulic pump (with hoses attached) removed from APU (para. 4-76)
Throttle cable disconnected from speed control lever (para. 4-107)
Battery cables disconnected from battery and removed from APU (para. 4-30)
Gooseneck coupled (para. 2-24) or supported at 64 inch (162.6 cm) height
REMOVAL
WARNING
APU must be cool before removal or you may be burned and injury to personnel
may result.
1. Remove locknut (1) and bolt (2) from APU fuel tank bracket (3) and APU frame (4). Discard locknut.
4-478