TM 9-2330-384-14&P
Section V. NONELECTRICAL GAGES MAINTENANCE
Page
Paragraph
Number
Title
Number
Gage Marker Rod Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-7. GAGE MARKER ROD REPLACEMENT.
THIS TASK COVERS
Installation
b.
Removal
a.
INITIAL SETUP
General Safety Instructions:
Equipment Conditions:
When working inside tank, always provide
Ref
Conditions
l
adequate forced air ventilation at the man-
hole opening with air directed into com-
4-73 Gage
marker disk and
ground wire
partment where work is being performed.
removed.
l NEVER work alone inside a tank; a second
person must be stationed at the manhole
Tools:
opening. The person inside the tank must
Tool kit, general mechanic's
l
have a safety line and harness on in case of
Tool kit, welder's
l
emergency for rescue operations.
l DO NOT perform any welding procedure
Personnel Required: Two
unless tank is purged.
References:
TM 9-237
l
5-23