TM 9-2330-386-14&P
5-10 SPRINGS (CONT) .
(8) Install two U-bolts (10), four washers (9), and locknuts (8). Torque lock
nuts to 300 lb-ft.
(9) Install four capscrews (7), washers (6), and lock nuts (5). Torque lock
nuts to 180 lb-ft.
(10) Repeat steps (7) through (9) for other end of spring (13).
(11) Raise floor jacks while guiding U-bolts (15) through trunnion hubs (4).
NOTE
Before tightening nuts (1), be sure bushings (16) are
centered in trunnion hubs (4).
5-16