TM 9-2350-222-10-2
OPERATE BOOM
(PREPARE
FOR
HOISTING
OPERATIONS)
-
Continued
26. Close retainer (G) on both boom travel locks (F).
27. Turn locking handle (E) clockwise until retainer (G) is tight.
28. Push locking handle (E) down.
CAUTION
If hoisting operation is performed on a hill, do not lift
over the downhill side of vehicle. Position vehicle so
load is on uphill side of vehicle.
31. Position vehicle (W):
a. On as level ground as possible.
NOTE
Lowered moldboard will act as a stabilizer during
b. So end of boom (H) is over load (X).
hoisting. If movement of vehicle is not required,
perform steps 32 and 33. If movement of vehicle is
required, skip steps 32 and 33.
TA252756
Change 1
2-293