TM 9-4110-255-14
b. Installation.
(1) Wrap anti-seize tape around compound gage (6) connector threads.
(2) Install compound gage (6), three bolts (5), and new self locking nuts (4).
(3) Install coupling (3).
(4) Aline copper tubing (2) and connect flare nut (1) to coupling (3).
(5) Seal any openings in back of compound gage (6) case with silicone RTV.
Figure 5-14. Compound Gage
NOTE
FOLLOW-ON MAINTENANCE:
Close left side door.
5-35