TM 9-4110-255-14
5-20. STRAINER REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Conditions:
Left side door open.
NOTE
Note flow direction prior to removal.
a. Removal. Loosen two flare nuts (1) and remove strainer (2).
Figure 5-16. Strainer
NOTE
Be sure to observe flow direction noted during removal.
b. Installation. Install strainer (2), tighten two flare nuts (1).
NOTE
FOLLOW-ON MAINTENANCE:
Close left side door.
5-38