TM 9-4110-256-14
b.
Installation.
(1)
Wrap anti-seize tape around compound gage (6) connector threads.
(2)
Install compound gage (6), three bolts (5), and new self locking nuts (4).
(3)
Install coupling (3).
(4)
Aline copper tubing (2) and connect flare nut (1) to coupling (3).
NOTE
FOLLOW-ON MAINTENANCE:
Close control panel cover.
5-35