TM 9-4110-258-13
5.17
ISOLATION VALVES REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Conditions:
Materials/Parts
Anti-Seize Tape
Refrigeration system discharged (para 5.13).
Left side door open.
a. Removal.
(1) Remove two isolation valve caps (1).
(2) Loosen two flare nuts (2) and move copper tubing (3) away from isolation valve (4) being careful not to
bend or kink tubing.
(3) Remove two isolation valves (4).
Figure 5-12. Isolation Valves
5-34