TM 9-4110-258-13
5.28 STOP VALVE (DEFROST LINE) REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts:
Equipment Conditions:
Lock Washers (2)
Insulation Tape
Left side door open.
a. Removal.
(1) Remove insulation (1) as necessary.
(2) Remove two bolts (2) and lock washers (3). Discard lock washers.
(3) De-braze two fittings (4) and remove stop valve (5) (para 5.10).
Figure 5-23. Stop Valve (Defrost Line)
5-52