TM 9-4120-378-14
4.17 PANELS-SERVICE. This task covers removal, inspection, cleaning and installation.
INITIAL SETUP
Equipment Condition:
Materials/Parts:
Warm, soapy water
Remarks
Action
Location/Item
Disconnect air conditioner power input
connector before doing maintenance
work on electrical system.
Front Top Panel
a.
Remove eight screws (1) securing front top cover
Removal
(2).
b.Remove front top cover (2).
Rear Top Panel
a. Remove seven screws (3) securing rear top cov-
Removal
er (4).
Always ground every capacitor likely to
hold a dangerous potential charge.
Slide rubber boots (5) away from capacitors (6).
Discharge capacitors (6) using instrument with
insulated handle.
Tag and disconnect leads from capacitors (6).
Remove rear top cover (4).