TM 9-4120-385-14
PURGE
NOTE
Nitrogen purge is used during brazing or debrazing operations and to
remove moisture from refrigerant system.
a. PREPARATION-SETUP.
1.
Remove two
screws and access cover.
2.
Release
CAUTION
system should not exceed 10 psig
N i t r o g e n pressure in the
(0.70 kg/cm2).
Attach center hose on charging manifold to dry nitrogen cylinder valve.
3.
4.
Connect low pressure (suction) hose from charging manifold to low pressure
5-23