TM 9-4120-402-14
4-4.
SERVICE UPON RECEIPT OF MATERIAL. - continued
c.
Receiving Inspection.
(1)
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report damage on DD Form 6, Packaging Improvement Report.
(2)
Check the equipment against the packing slip to see if shipment is complete. Report all discrepancies
in accordance with instructions of DA Pamphlet 738-750 (The Army Maintenance Management System).
(3)
Check to see whether the equipment has been modified.
4-5.
INSTALLATION INSTRUCTIONS.
a.
Air Conditioner Preparation For Installation.
(1)
Only one input power connector is provided on the air conditioner and must be relocated for alternate
locations.
Figure 4-3. Alternate Input Power Connector Locations
(a) Air conditioners are shipped from the factory ready to use the primary input power connector
location (front of unit).