TM 9-4120-408-14
5-10. CONDENSER PRESSURE SWITCH MAINTENANCE. (Continued)
(2) Position switch mounting bracket (9) on condenser assembly (10) and secure with four flat washers (8),
new lock washers (7), and screws (6).
NOTE
When installing tape on capillary tube, ensure tape edges overlap and no portion of capillary tube is
exposed to air.
(3) Insert capillary tube (1) through grommet (18). As required replace tape on capillary tube (1) with new
tape.
Secure pressure switch S4 with three nuts, lock washers, flat washers, and cushion
clamps.
Secure pressure switch S6 with five nuts, lock washers, flat washers, and cushion
clamps.
(4) Position capillary tube (1) in four cushion clamps (17) and secure to condenser housing (10) with four flat
washers (16), new lock washers (15), and nuts (14).
NOTE
When installing capillary tube on tee, ensure chain for access port cap is secured by
flare nut.
If new switch is being installed install flare nut on capillary tube and flare tube to 45
.
(5) Install capillary tube (1) on tee (13) and secure with flare nut (12).
(6) Coil excess capillary tube (1) and secure with new tiedown straps (11).
(7) Follow on maintenance: (a) Refer to paragraph 5-14 and replace dehydrator.
(d) Refer to paragraph 4-16 and connect wiring harness single leads as required.
5-23