TM 9-4910-387-14-2
6-5. RH CONTROL EQUIPMENT ASSEMBLY-MAINTENANCE INSTRUCTIONS (cont)
REASSEMBLY OF RH MOUNTING BOARD ASSEMBLY (cont)
21 THREE WIRES. Solder bare ends to
stepping relay contact (30),
latching relay coil contact (31), and holding relay contact (32).
Position other ends with terminal lugs on terminal C9.
22 SCREW (33). Install through three terminal lugs into terminal C9.
23 TWO WIRES. Solder bare ends to
holding relay coil contact (33.1)
and holding relay contact (34). Position other ends with terminal
lugs on terminal C12.
24 SCREW (35). Install through two terminal lugs into terminal C12.
6-204