TM 9-2330-373-14 & P
4-38. DOORS (cont).
INSTALLATION OF BOLT SLIDE FASTENERS AND
LOCKING RODS
1. Position both bolt slide fasteners (13) and secure
each one with four bolts (6), spacers (12),
washers (7) and nuts (8).
2. Position upper locking rod (4) on upper bolt slide
fastener (13). Position lower locking rod (11) on
lower bolt slide fastener (13). Secure to each
bolt slide fastener with screw (14) and washer
(15).
4.
Upper locking rod
6.
Bolt
7.
Washer
8.
Nut
11.
Lower locking rod
12.
Spacer
13.
Bolt slide fastener
14.
Screw
15.
Washer
INSTALLATION OF ROLLER LATCH LOCK
ASSEMBLY, SIDE DOOR/PARTITION DOOR
1. Position roller latch lock assembly (10) and
secure with four bolts (6), washers (7) and nuts
(8).
2. On roller latch lock assembly (10), position lower
end of center locking rod (5) with upper end of
lower locking rod (11). Secure with shoulder
screw (1) and washer (2).
1.
Screw
2.
Spacer
5.
Center locking rod
6.
Bolt
7.
Washer
8.
Nut
10.
Roller latch lock assembly
11.
Lower locking rod
TA 314842
4-122