TM 9-4120-385-14
d. INSTALLATION.
1. Top Panel.
(b) Align panel with corresponding holes and secure with eleven screws (1) and
rain seal washers (2).
2 . Lower Panel.
(b) Align panel with corresponding holes and secure with two panel
fasteners (1).
3 . Canvas Cover.
(a) Install canvas cover (3) on top panel as shown in Figure 4-5.
(b) Align cover with corresponding holes and secure with sixteen screws (1) and
rain seal washers (2) and two panel fasteners (4).
(c) Zip cover shut or roll up and tie with straps.
4-11. FRESH AIR INLET SCREEN AND GUARDS
This task covers:
c . Inspection
a. Removal.
b . Cleaning
e . Installation
d. Repair
INITIAL SETUP
Equipment
Condition
Materials/Parts
Detergent solution
Cleaning Cloths
Container to hold solvent and screen
-
4-31