TM 9-2330-381-14
2-27.
DUAL WINCH LOADING AND UNLOADING (CONT)
(i) Push CABLE HOLD DOWN lever (22) to ON position.
(j) Pull PASSENGER SIDE WINCH lever (23) upward momentarily until there is enough slack in passenger
side winch cable (24) to be removed from stow hook (25). Move clevis on winch cable (24) off of stow
hook (25) to unstow winch cable. Continue paying out winch cable (24) until spotter on the ground can
reach clevis. Release lever (23).
(k) Remove and retain cotter pin (26) and shouldered pin (27) from clevis on passenger side winch cable
(24).
(l) Remove cotter pin (28) and shouldered pin (29) from auxiliary winch cable clevis (30). Install auxiliary
winch cable clevis (30) over one ear of clevis on passenger side winch cable (24) and install shouldered
pin (29) and cotter pin (28).
(m) Engage AUXILIARY WINCH KICKOUT by lifting and rotating lever (10) clockwise.
Disengage
PASSENGER SIDE WINCH KICKOUT (21) switch by pulling switch.
WARNING
Do not allow auxiliary winch cable to cross itself or knot up on winch or injury to
personnel may result.
(n) Using one person to operate winch controls and a second person to make sure that winch cable devises
do not hang up on platform, push down on AUXILIARY WINCH lever (31) to pull passenger side winch
cable (24) toward auxiliary snatch block (17).
2-130 Change 1